Technical Description:
Design, build, assembly and installation of the complete vacuum system of the Australian Synchrotron Project.
Design, build and UHV–test of 72 ultra high vacuum chambers inclusive 118 Photon Stop Absorber and 36 RF shielded Bellows for the Synchrotron radiation storage ring Boomerang
Assembly and installation of 14 Arc Sections and 13 Straight Sections inclusive bake out and UHV–test.
Technical Data:
Pre Dipole Chamber | 15 pieces | |
First Dipole Chamber (Standard) | 12 pieces | |
First Dipole Chamber (IR) | 3 pieces | |
Intra Dipole Chamber | 15 pieces | |
Second Dipole Chamber | 15 pieces | |
Standard Straight Chamber | 9 pieces | |
Diagnostic Straight Chamber | 1 piece | |
Kicker Straight Chamber | 2 pieces | |
Photon Stop Absorber mit und ohne aperture |
118 pieces | |
Beam Stop Absorber | 28 pieces | |
RF shelded Bellow | 36 pieces | |
Kicker BPM Flange | 4 pieces | |
Full metal system made of: | Stainless steel 316LN | |
spec. desorption rate: | < 1x10-12 mbar . l . sec-1 . cm-2 |
|
He– Leakage rate: | < 1x10-9 mbar . l . sec-1 |
|
final pressure of the installed Arc Sections and Straight Sections: |
< 1x10-9 mbar | |
permeability:: | < 1,01 |
Customer & Period:
Customer: |
Australian Synchrotron Project | |
Period of Implementation: |
May 2004 to April 2006 |